Came across this on the net today, apparently the stack failed to go down using explosives, so they tried to take it down with an excavator, but it fell back on it. Glad the operator was ok.
It never seems to amaze to me how Demo companies take on taking down stacks. All they had to do is rent one or two 180 foot personal lifts, two 185 CFM air compressors, and have a 2 man crew on each lift take it down by hand, and when they have it at a safe height maybe 20 feet take the rest down with an excavator.