|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
The noisy hub is removed to be internally inspected: While the Caterpillar dumper 793D overhaul progresses, we'll go back on site tomorrow to solve some electrical supply "problems". Regards. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 7/6/2015 Posts: 1,317
|
Guy that hub is fantastic, I can only imagine the amount of time involved with the detail. Steve
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
The site experienced in the past several power outages, due to defects on the existing cables running to electric shovels. To minimize downtime, the mine management decided to order new cables and to take the opportunity of a synchronized site shut-down to replace the defective ones: the operation is planned for tomorrow. Loading of new cables drums at the storage area for dispatch on site: An unused wheel loader has been modified and starts a new working life as cable-layer: To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
While new cables drums are dispatched around the site, existing power cables are taken down from their road crossing poles: To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
The following morning, power is cut on the whole site and existing cables immediately disconnected on both ends. New cables - which have been run alongside during the night - are connected between shovels and local junction boxes while the "cable-layer" recovers old sections: To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
New cables are laid in a similar way (preparation time was too short to optimize downtime and get a simple change-over between power cables): It now just a matter of connecting power supplies to local junction boxes and to get all testing completed: then shovels can start digging again and operations continue. To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
While electric shovels are restarted and mine activity is brought back to normal, the cable-layer is running new power cables to remote secondary locations: Some close views of the cable-layer locally-made attachment, during its tests before the change-over operation: Regards. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 12/17/2006 Posts: 1,628 Location: Hebron, In
|
The diorama is incredible. Love what you have done with the Cat 988 but every time I see the Peterbilt dragging the radiator guard on the ground I want to scream and fix it.
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
Claus, Thanks for the comment: I don't think that anybody here has noted that inverted grille protection on the Peterbilt. The oversize load sign was put back in place after weathering, without realizing that there was a problem. What's happening here this morning? Apparently, a brand new equipment has just been delivered to LorraMine: To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
Whaouh!!! What a beast!!! Mine mechanics and the Liebherr Assistance Team are completing the 9800 rebuilt after its transport to site and proceed to final checks: To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
It's time for some practical training for future Operators, before the giant excavator is moved to the mine site: To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
Let's hope that tomorrow, we'll get all permits and authorizations to take pictures of the 9800 first day at work. Regards. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 7/6/2015 Posts: 1,317
|
Guy any pictures of that monster being delivered and put together. Steve
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
Steve,
No picture, sorry. "Our photographer" doesn't work full time in LorraMine and he was busy at that time with the new workshop delivery and with its dump body handling equipment delivery/installation and test. He missed all operations associated with the Liebherr 9800 delivery, but I'm sure that we'll get in the future some other opportunities with other mining "giants" being delivered.
Regards. Guy,
|
|
Rank: Advanced Member Groups: Member
Joined: 7/6/2015 Posts: 1,317
|
Guy thanks for the information, great pictures as usual. Steve
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
GuyM wrote:[...] Let's hope that tomorrow, we'll get all permits and authorizations to take pictures of the 9800 first day at work [...] The Liebherr 9800 was already at work when "our photographer" found a suitable location to "shoot the beast": To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
To be continued. Guy
|
|
Rank: Advanced Member Groups: Member
Joined: 9/4/2005 Posts: 3,347 Location: Le Muy - Var - France
|
|
|
Rank: Advanced Member Groups: Member
Joined: 7/6/2015 Posts: 1,317
|
Guy you must have greased the palms of some very important people to get permits that quick. Around here it takes a year just to have them get back to you saying that they received them. Steve
|
|
Guest |