|
Rank: Advanced Member Groups: Member
Joined: 12/25/2007 Posts: 1,358 Location: Kodiak Ak.
|
One down. Now that the walkways are set we grouted the panels on the Dock. 16 pallets of grout through the little mixer. Install the fenders. Hanging ladders. All Done. Pull Anchors. Removing the old dock We started this job on May 6th and the tug came and picked us up on September 3rd.
|
|
Rank: Advanced Member Groups: Member
Joined: 4/14/2010 Posts: 393 Location: ste. anne manitoba canada
|
great pics Lash ... TFS ... Regards, Larry
|
|
Rank: Advanced Member Groups: Member
Joined: 6/26/2007 Posts: 1,706 Location: Australia
|
Very nice Lash, great start to my day and very much appreciated. Some nice old timber in that old dock also...I can see that cut up and turned into a nice few display cabinets.
|
|
Rank: Advanced Member Groups: Member
Joined: 12/25/2007 Posts: 1,358 Location: Kodiak Ak.
|
Thanks guys. That dock material was heavy Creosote. It was deemed hazardous waste. We sent it to Seattle and then it went to the land fill in Arlington Oregon.
|
|
Rank: Advanced Member Groups: Member
Joined: 5/18/2008 Posts: 515 Location: Richfield, Oh (Cleveland)
|
It was great following your job Lashlander. Thanks for sharing it with us. AHh....Weren't you going to show us one more thing?
|
|
Rank: Advanced Member Groups: Member
Joined: 6/29/2007 Posts: 574 Location: Atlanta, GA
|
Great pix and story Lash, tfs! Bug ITW Security
|
|
Rank: Advanced Member Groups: Member
Joined: 3/23/2010 Posts: 550 Location: So Cal
|
thats a pretty neat job! thanks for sharing feel free to share more i really enjoed seeing this project thanks
|
|
Guest |